I just received my new CTO 17" MBP (hi-res matte, 7200 RPM drive) today, actually a week earlier than expected. I ordered July 15th, with an estimated delivery of August 10th.
Not sure if this has been posted already, but the first thing I noticed when I opened the box was that it came with the new smaller power adapter. So everyone that ordered within the last few weeks can breathe easy - you should get the new power adapter.
Fit and finish seem to be perfect as well. I will report back once I actually turn the thing on and see how the screen and everything else looks.
Not sure if this has been posted already, but the first thing I noticed when I opened the box was that it came with the new smaller power adapter. So everyone that ordered within the last few weeks can breathe easy - you should get the new power adapter.
Fit and finish seem to be perfect as well. I will report back once I actually turn the thing on and see how the screen and everything else looks.