I really hate to do a triple post. I was going to wait until the next post to post this but nobody was posting
Maybe after it gets bumped up Mods can combine?
Anyways yesterday went fairly smoothly. Carpet came up okay, carpet pad came up okay, but the staples were another story. I would say it took 40 minutes for the carpet/pad, but another 1 1/2 hours to walk around with pliers/flat head screwdriver pulling up staples. No pictures with the carpet out though. Sorry!
Today we woke up and laid down the underlayment. I really was surprised how long it took to get perfect! Even then, as we laid the floor our work got screwed up again
. We started in the dormer window, and it went fine until we got to where the walls go out on both sides. Luckily we are left with a pretty small gap that will either be filled with a sliver of flooring at the end, or some quarter-round
. It took about 3 hours to get "out" of the dormer window, but once we got the air vent covered we flew to where it is currently in about 2 hours. We should finish tomorrow and put in all of the quarter-round on Saturday. That means furniture move in soon!!
Sorry of all of the rambling. Here are some pics.
1st: finished floor
2nd: Remaining space