Probably ended it all. Poor fella.Has anyone seen Azrael?
Probably ended it all. Poor fella.Has anyone seen Azrael?
"pipeline" doesn't really mean 2-30 days. that's a stretch. Sounds more like code for end of year. You see how far our over optimism got us today.
Disappointed. I think a refresh will happen after the back to school period. It will be just intel processor update. Redesign next year.
Virus is killing tech manufacturing.
Going to keep current iMac until the spring and just get the new processors from Apple and jump in on the first gen.
I was wondering about that cos they did mention STR was written for Metal and the snapshot didn’t really specify what GPU it was using... given that a Mac mini runs on igpu I’m inclined to think that this is Apple potentially snubbing both intel AND AMD?
Worldwide DEVELOPERS conference. While WWDC has had hardware reveals in the past, it's still a software focused event.So guys, what do you think ?!?!?!?!
New 40" inch iMac with chinless iPad Pro Design!
OLED-Screen!
Build in FaceID without notch!#
Intel Lakefield chipset!
RAM and SSD swappable!!!
This is wonderful! Thank You Phil Schiller and Steve Jobs, You guys are the BEST!
Oh, what? Steve Jobs is dead? Cook is CEO? No Hardware at WWDC2020? ARM-based Macs?
What is this? Who meddled with the future? This is like coming back and seeing, that Biff Tannen married Lorraine ...
There's something coming, the refurb store was just restocked and holy wow are the BTO configs Priced To Sell!
i9/V48/512SSD for $2800!
That's seriously tempting...
I think it is time to build a pc. My imac is on its last leg. Definitely wouldnt buy a first gen arm mac.
Wow. I can't believe it. NO NEW IMAC ? 175 pages for NOTHING ?
There is no need to argue, that "Apple Silicone" is "far superior" then Intel. Even IF this was the case, the result will be a second "Betamax"-Desaster. Betamax was superior to VHS but it lost the war. There are billons of Macs out there, that operate in Windows environment with very specific software, that is only available to Windows. Until now, the iMac has been the best, most stable and reliable Windows machine, but this Rosetta-Desaster will put an end to this. The guys over at Dell and Lenovo are having the party of their lives...
The Developer Transition Kit has 16GB RAM. The very best iPad Pro has 6GB RAM. iPadOS is leaner than macOS, so it is doubtful.**** what if one can instal macOS Big Sur on iPad Pro?!?!
Source link please?Based on the info and dev kit
-bootcamp will still available after sept/oct with the release of windows10 arm to buy
- first mac with arm will be after sept based on the next a14 silicon 5nm vs intel 14nm
The apps that are not build for arm will lose between 4-10% performance thanks to the perfect emulation
While on surface proX the emulation can lose up to 62% of performance
Now there’s even less chance that this will happen. It makes no sense to do a global redesign for the sake of one of the latest generation of Intel, to again change the structure for Silicone. Unless they can unify it, which is also unlikely.All may not be lost. Could still see redesign intel based iMacs next month...
I did not play Tomb Raider, but didn’t you think that the graphics there were much worse than in the regular version?I was amazed Shadow of the Tomb Raider was running on an A12Z with Rosetta 2. I tried it on a 2019 MacBook Air i5 and the fan was SCREAMING with graphics all the way down, and I still had FPS issues. So it looks like even X86 apps run better on ARM than Intel LOL.
Gone into a binge?Has anyone seen Azrael?
There is no need to argue, that "Apple Silicone" is "far superior" then Intel. Even IF this was the case, the result will be a second "Betamax"-Desaster. Betamax was superior to VHS but it lost the war.
They talked about how they have improved GPU performance by a massive amount (1000x?), and repeatedly talked about System on Chip. I think they did more than imply.Apple also upped the ante by implying they do their own GPUs. Now, taking on NVIDIA, AMD and Intel all at the same time... Where's that popcorn?
"pipeline" doesn't really mean 2-30 days. that's a stretch. Sounds more like code for end of year. You see how far our over optimism got us today.
There are billons of Macs out there, that operate in Windows environment with very specific software, that is only available to Windows. Until now, the iMac has been the best, most stable and reliable Windows machine, but this Rosetta-Desaster will put an end to this. The guys over at Dell and Lenovo are having the party of their lives...